08:00-08:30 am |
Assembly of students at practical ground/ Roll call/ Warming up exercise. |
08:30-1:00pm |
Erection of safety nets. Introduction to excavation, practical in shoring, sloping, benching and working inside the trench. |
03.00-05.30pm |
Documentation-Work at height permit, excavation permit. Documentation work of Carrying out Risk Assessment, incident reporting and accident reporting. Documentation -Practical maintenance checks on portable extinguishers and recording observations. |
Day 7 (7.30 hrs) |
|
08.00-12.00noon |
Entering a smoke filled area / rescuing people, entering tunnel like spaces, wearing SCABA . Filling of Confined space entry permit, Hot work permit./ Imparting Orientation training to new employee. |
12.00-01.00pm
|
Documentation-Carrying out auditing and submitting reports. Introduction to electrical safety devices, AVO Meters, Circuit breakers etc.
|
03.00-05.30pm |
Introduction to Fire detection & Alarm System, Practical operation and evacuation. Sounding of Siren ,carrying out mock drill of fire fighting.
|